City Of Sacramento Curb And Gutter Standard Drawing
15 6 4 curb gutter sidewalk and alley aggregate base sections 11 15 6 5 longitudinal curb and gutter slopes.
City of sacramento curb and gutter standard drawing. 207 curb and gutter transitions for drain inlets. A dowelled joint must be used as shown on standard drawing 4 32 at the connection of new sidewalk and curb and gutter to existing sidewalk and curb and gutter. For separated curb gutter sidewalk. Adjacent to all areas of removal of curb and gutter a 2 foot minimum wide 6 inch minimum deep bank of existing roadway pavement must be saw cut and removed.
203 median and barrier curb. 2010 amendment 1 amendment of details 208 209 242 addition of 208a 209a delete 211 amendment august 2010 effective 9 1 2010. 205 driveway w curb and gutter separate from sidewalk. If a design element is not a city standard an appropriate caltrans or aashto standard is to be applied.
2020 city of sacramento. Standard details 205 and 206. Elements that are not city design standards. Design features not addressed by.
Qualifying residential locations are primarily prioritized by the estimated level of pedestrian usage as set forth in the sacdot pedestrian master plan and scheduled for. Sacramento city code section 12 32 sets forth the city s procedures under these sections. 206 driveway w curb and gutter monolithic to sidewalk. Accessibility mode is enabled.
201 vertical curb gutter with sidewalk. However curb and gutter maintenance is the city s responsibility. Sacramento is not the only city to require sidewalk repairs to be the property owner s responsibility. 202 southport street std.
208 parallel curb ramp new.